Home MenuAquatic Center Renovation Project
Construction Start: April 2019
Final Completion: December 2022
On July 10, 2018 the Fort Lauderdale City Commission authorized staff to negotiate a design-build contract for the renovation of the Fort Lauderdale Aquatic Center with Hensel Phelps Construction Company in the not-to-exceed amount of $27,000,000. Hensel Phelps was awarded a design-build contract on August 21, 2018 with a guaranteed maximum price of $26,995,368 based upon their own due diligence and the design criteria package in City’s Request for Proposals (RFP) No. 12072-483 which provides specifications, requirements and 30% schematic designs.
Design elements of the base contract include:
- Remove existing 50M main competition pool and provide a new expanded fully FINA compliant standard pool with two 82’ x 6′ bulkheads. Size: 53M x 25M, 10 lanes; Depth: 2M – 3M – 2M
- Remove existing diving pool and provide new fully FINA compliant diving pool and tower including five platform levels (1M, 3M, 5M, 7.5M, 10M), and 1M and 3M springboards; Size: 25M x 25M; Depth: 6M
- Remove existing spa for divers and provide new spa. Size: 14FT x 10FT
- Repair existing 50M Training Pool with new surfacing and gutters. Size: 50M x 25Y; Depth 4FT – 12.6FTRelocate and expand the instructional pool to the southwest corner of the peninsula.
- Provide new filtration system, pumps, and chlorination system for all pools.
- Resurface and raise pool deck to allow for increased pool depths for competition-level use.
- Remove existing grandstand building and bleachers on north side of facility and provide new grandstand with spectator restrooms, concessions, ticket office, and metal bleachers for +/- 1,500 spectator capacity.
- Provide site improvements that include parking and drainage improvements, new stadium lighting, landscaping, sidewalks, and new main entry plaza.
Additional elements to be designed and priced include:
- Renovation of the locker room building
- Enhancements to main entry plaza
- 27M dive tower
Design Data |
|||||
Units |
Training Pool | Competition Pool | Dive Pool | Spa | |
Length | Feet | 164 | 176 | 82 | 14 |
With | Feet | 75 | 82 | 79 | 11 |
Water Surface Area | Square Feet | 12,300 | 14,432 | 6485 | 149 |
Perimeter | Feet | 479 | 517 | 322 | 49 |
Volume | Gallons | 749,348 | 976,340 | 926,578 | 2,912 |
Circulation System & Filters | |||||
Pool Turnover Rate | Hours | 5.68 | 5.92 | 5.72 | 0.46 |
Recirculation Rate | Gallons Per Minute | 2,200 | 2,750 | 2,700 | 105 |
Filtration Rate (Max Design) | Gallons Per Minute/Square Feet | 1.5 | 1.4 | 1.4 | 20.0 |
Filtration Area Required | Square Feet | 1466.7 | 1,964.3 | 1,928.6 | 5.3 |
Filtration Rate (Actual) | Gallons Per Minute/Square Feet | 1.4 | 1.1 | 1.1 | 15.4 |
Filtration Area (Actual) | Square Feet | 1,625 | 2,422.0 | 2,422.0 | 6.8 |
Filter Backwash Rate | Gallons Per Minute/Square Feet | 0.5 | 0.5 | 0.5 | 15.0 |
Backwash Flow Rate (Per Filter) | Gallons Per Minute | 300 | 300 | 300 | 103 |
Surge Capacity | Gallons | 6,277 | 16,221 | 7,811 | N/A |
Design Fill Rate | Gallons Per Minute | 173 | 170 | 161 | 24 |
Design Fill Time | Hours | 72 | 96 | 96 | 2 |
Bather Load | Persons | 440 | 550 | 540 | 14 |
Owner/Operator: City of Fort Lauderdale
Lead Design-Builder: Hensel Phelps Construction Co.
Aquatics Designer: Counsilman-Hunsaker
Aquatic Sub-Contractor: Weller Pools
Architect: Cartaya & Associates
Geotechnical Engineer: Langan
Civil & Landscape Designer: Keith & Associates, Inc.
MEP & Structural Engineers: WSP